← Back to browse
HR 3898 Passed a chamber

Amends the Federal Water Pollution Control Act to narrow which waters need federal discharge permits, limit state water quality certification reviews, and speed up permit decisions for infrastructure, energy, and farm projects.

Official title: PERMIT Act

Next stop Senate: awaiting action
Timeline each lane is a chamber; dates pull from congress.gov actions
House
Introduced 11-JUN-2025
Referred 11-JUN-2025
Approved by committee 25-JUN-2025
Reported 02-JUL-2025
On the calendar 02-JUL-2025
Passed 11-DEC-2025
Senate
Received 15-DEC-2025
Key points
  • Excludes waste treatment systems, groundwater, rain-driven ephemeral features, and certain farmland from the definition of navigable waters.
  • Bars permits for agricultural stormwater that runs off in direct response to rain, and bars permits for pesticide residues from pesticides used under federal law, with specified exceptions.
  • Requires states and the EPA to decide water quality certification requests within one year and limits court challenges to energy project certifications to filings within 30 days, with a 120-day deadline for final court decisions.
  • Extends the length of certain general permits and NPDES permits to ten years and requires the Army Corps of Engineers to keep nationwide permits for linear infrastructure and pipeline projects.
AI-generated from the Referred in Senate text of 15-DEC-2025 · verify · report an error
Official CRS summary

Covers an older version. The newest CRS summary describes the bill as of "Introduced in House" (11-JUN-2025); the text has changed since (Engrossed in House, 11-DEC-2025).

CRS is the Library of Congress's nonpartisan research office. Read it on congress.gov
Committee referrals (3) Policy area

Environmental Protection

Sponsor Mike Collins (R-GA) Cosponsors · 8
■ 8 R